Many homeowners worry about how the construction process will affect their homes and their lives. To ease your mind, we've assembled a step by step outline to help you know what to expect. 

Excavation for a vinyl-lined pool is a job for an experienced backhoe operator. Normally the side excavation is approximately two feet beyond the finished pool perimeter to allow for assembly and a concrete footing to be installed.

The second step includes assembly of the steel panels and stairs, coping receptor, skimmer and inlets as well as suction and return plumbing.

Most builders pour the concrete decking once all of step two is completed but in some cases and with certain water table situations, the liner will be installed before the decking is poured. The pool structure is strong enough to allow installation to proceed in either manner.

In this photo we see the liner being installed. This is where an experienced expert makes all the difference!

Fill it with water and enjoy all of the health, fitness and entertainment value of a spectacular poolscape in your backyard!

Olympic Pool and Spa

217 Route 46 West
Saddle Brook, NJ 07663
Phone:  201-845-7454
Fax:  201-845-9052
Email:  olympicpools@gmail.com

Olympic Pool and Spa

186 Gold Mine Road
Flanders, NJ 07836
Phone:  973-448-0007
Fax:  973-448-0014
Email:  olympic3@verizon.net